Filming schedule
Filming Schedule
5/3/12: Start filming scene 1 (nurse and friend), scene 2 (blood red hand) and scene 3 (the open door)
6/3/12: film scenes 4 (emma) and 5 (door slam) and scene 6 which is dragging down the corridor
8/3/12: film scene dragging part 2 and finally emmas painting.
You can make this more detailed by adding times
ReplyDelete