Tuesday 24 April 2012

Filming schedule

Filming Schedule 

5/3/12: Start filming scene 1 (nurse and friend), scene 2 (blood red hand) and scene 3 (the open door)

6/3/12: film scenes 4 (emma) and 5 (door slam) and scene 6 which is dragging down the corridor

8/3/12: film scene dragging part 2 and finally emmas painting.



1 comment:

  1. You can make this more detailed by adding times

    ReplyDelete